Construction of pad transfer station, Baghdad
The task of removing and disposing of municipal solid waste and other waste accumulated at ten open dumpsites within the city of Baghdad formed the main aim of this $3,294,750 contract funded by the Coalition Provisional Authority. To enable a smooth operation, each of the ten 675 m2 sites required the construction of concrete pads and a pusher wall.
Al Qarya Group was the sole contractor performing this task.
Total Value of Contract: $3,294,750
Date of award: 2004
Date of Contract Completion: 2004